Modernization of the sinter mix loading unit for sintering machines at the sinter plant with optimization of the layer shape on pallets

Increasing the specific productivity of the sinter plant sintering machines

STAGES OF WORK

Stage 1
1. Analytical and patent review

2. Development of methodologies for conducting industrial research

3. Development of the sinter mix flow stabilizer design

4. Optimization of the layer shape on the sintering machine by implementing the sinter mix flow stabilizer
Stage 2
1. Adaptation of the mathematical model for the shuttle conveyor operation

2. Implementation of the control model, including necessary retrofitting

3. Conducting pilot industrial tests and confirming the economic effect
Result
Increase in the specific productivity of sintering machines by 1.2%

BEFORE AND AFTER MODERNIZATION

Back to projects Discuss a project
Client
Location
Sinter Plant No. 5
Year
2021

SIMILAR PROJECTS