Sinter plant technological audit

Development of recommendations for improving the efficiency of sintering production

ABOUT THE PROJECT

Within the framework of the "sinter plant technological audit," changes were developed and recommended for technological instructions in the following areas:

1. Sinter mix homogenization
2. Pre-moistening, mixing, and pelletizing of the sinter mix
3. Sinter mix charging and operation of the shuttle distributor
4. Level regulation in the bunker and stabilization of the sinter mix flow to the sintering machine
5. Control of gate sections and operation of the nine-roll distributor
6. Compaction, ignition, sintering, and cooling of the sinter cake

Modernization of the sinter mix loading angle

Installation of a conical insert into the drum body, adjustment of rotation frequency and water supply volume. Installation of a sinter mix flow stabilizer.

Throttling of the first two windboxes of the sintering machine

Back to projects Discuss a project
Client
Location
Mining and Processing Plant: Sinter Plant No. 5
Year
2023